Process Automation
Industrial Information Systems
Specialist Electrical Engineering
Process Improvement Solutions

Business Sectors

Energy, Oil and Gas
Bord Gais Eireannn
AGI Design for Natural Gas Transmission and Distribution
Wales and West
AGI Design for Natural Gas Transmission
Fuel Distribution Terminal Automation
ESB Moneypoint
Start-up support post upgrade at 900MW coal plant
Long Gannet, Scotland
Start-up support post upgrade at coal plant
Bord Gais Independent Energy
220kV substation upgrade at Whitegate 400MW CCGT
Northern Gas Networks
AGI Design for Natural Gas Transmission
Huntstown Power
Start-up support post control system upgrade at 400MW CCGT. EDIL interface

Distributed Power Generation & Controls
5MWe Gas Turbine CHP Plants
Carbery, Dairygold (3), Glanbia Ballyragger (2), Kerry Charleville, Diageo / Guinness (3), Lakelands, Pfizer Grange Castle, Pfizer Nutritionals Askeaton
Standby Diesel Generators
Pfizer Grange Castle (8MW), Pfizer Newbridge (2MW), Lisheen Mine (6MW), BGE (0.2MW), Dairygold (2.2MW)
Steam Turbine
Munster Joinery - 3MWe wood waste biomass CHP
Steam Engine
Dynea 200kW steam engine

Wind Power Generation and Substation Design
Electrical Design for 800kW turbine in an industrial plant
Bawnmore Windfarm
Electrical Design for 30MW windfarm, including design of Contestable Build 38kV Substation to ESB networks Functional Specification
Dromdeveen Windfarm
Electrical Design for 30MW windfarm with 38kV Grid Connection
Drumlough Hill Windfarm 38kV Substation
Complete electrical design for 15MW Phase 2, including design of 38/20kV Substation
Boggeragh Windfarm 110/20kV Substation
Complete electrical design for 60MW/120MW windfarm with Contestable Build 110kV Eirgrid and IPP Substation, 13kM 110kV line. Future expansion to 120MW. PSDP
Lisheen Mine Windfarm 110/20kV Substation
60MW windfarm. MV protection panel design, including control of 20kV Substation and interface to 110kV Substation
Beallough Windfarms
1.7MW Wind Electrical design engineering
Munster Joinery
2 No. 2.4MW wind turbines on industrial site with 3MWe wood waste biomass CHP. 38/20kV network interface
38kV Substation design for 20MW waste incineration plant

Food and Beverage
Brewing Process Automation (FactoryTalk View, Allen Bradley PLC)
Lakeland Dairies
Enterprise System Platform SCADA & Dryers, Lactose, Bagging and UHT Automation
Pepsico Carrigaline and Little Island
System Platform SCADA, Data Historian, Information Server, Wonderware InBatch
Plantwide System Platform MIS, EBR & Dryer, Evaporator Automation
Dailuine Dark Grains Plant
Automation Commissioning
Talisker and Cardhu Distillery
Automation Commissioning

Utilities SCADA, Boiler Controls, Refrigeration
Bulmers Clonmel
Biogas Boiler
Glanbia Ballyragget
Steam, Raw and Treated Water, WWTP, Refrigeration AD Plant services for Milk Processing Plant
Heineken Cork
Utilities SCADA, unmanned boilerhouse for Brewery
Pfizer Ringaskiddy
Unmanned boilerhouse for API plant
Lakeland Dairies
Utilities SCADA, Boilers, Refrigeration for Milk Processing Plant

Water Treatment
MSD Brinny
Waste Water Treatment plant for biotech pharma plant

MSD Brinny
Biotech Pharma Process Automation
GE Healthcare
Batch Pharma DCS Automation
De Puy Johnson & Johnson
Automation Strategy Study
Leo Pharma Cork
Pharma Process PLC / SCADA Automation